1st July



Glued second layer of 10mm ply on the bottom this afternoon.  Now all the woodwork is done before fairing up in preparation for glassing the hull.  Im going to remove all the screws used to fix the second layer of ply on and tape up the holes that go through the hull on the inside and fill the holes with epoxy.  A bit of a tedious job but dont see the need for all those screws and dont want to grind off the points on the inside.  Grinding will heat up the screw and destroy the epoxy seal anyway.  Going to go and give the screws a small turn late this evening to break the epoxy hold on them before the epoxy gets too hard and remove them tomorrow morning before going off to do more tiling.

No comments:

Post a Comment