7 th March
Weather was good for a few days so went hunting for kitty food. Spent some hours on the sea but is was not fireworks. Kitty happy though with some fresh triggerfish treats and a bit for the freezer.
Some goodies arrived from Temu.
Engine mount came surface mail from China and took 2 months. Only cost 67 euros and could never make one as good for that price.
A small 3m2 kite also arrived. Going to play with it to see if it could be useful as an emergency sail in case the mast goes swimming. Very small and light package.
Clear skies so cold temperatures for epoxy etc.
Trim tabs faired and got their tops with handles epoxied on today. Keeping kitty company while getting some warmth to cure. Next job is to give them some coats of epoxy primer before making the support brackets. I was going to make the brackets with polyester resin but only have a little old polyester resin and plenty of epoxy resin. Just have to leave out chop strand mat.
No comments:
Post a Comment