1st December

Still busy with house work but the humidity was nice and low today so spent a few hours on Nuts this evening.  Ran a heater inside the boat for a few hours to dry out humidity in the raw wood and coated the pine stringers with epoxy resin.


Hull plywood was epoxy saturated before assembly and only had to coat the stringers and chainplate ply doublers.  Going to let that cure and give it a sand and can then start with the epoxy primer paint and polyurethane overcoats.  Only doing below the bunk and inside of galley box for now.  

Still a week or two of house work to do but going to spend some time on Nuts as the humidity is going to be OK for a few days and dont need to run the dehumidifier.  Going to get a bit cold but just fire up the workshop heater which works a treat.

No comments:

Post a Comment