14th September
Did some things on Nuts today😃. Been almost a week without progress due to a different project which needed a roof before the rain that arrived today.
First job was planeing and ripping some rough pine to make more strips. Big pile of wood shavings on the floor but not worthy of a photo.
Used some of the new strips to continue framing the cockpit. Got them glued in this evening.
I also drilled and prefitted coachroof sides but will only glue them on after cockpit ply is prefitted. The top ply was cut some time ago but I did it just to see how the deck beams faired out. It will only be glued on when the inside is done and painted.
No comments:
Post a Comment